Fakta om udbudet
Bestilling af materiale
http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=229913&B=ENERGINET
Udbyder
Energinet Eltransmission A/S
Vindere
Framework Agreement for Cable Monitoring Systems — DTS/DAS Systems
(24.01.2020)
NKT Photonnics GmbH
Schanzen Str. 39
51063 Köln
Framework Agreement for Cable Monitoring Systems — DTS/DAS Systems
(24.01.2020)
AP Sensing GmbH
Herrenberger Str. 130
71034 Böblingen
Framework Agreement for Cable Monitoring Systems — DTS/DAS Systems
Energinet Eltransmission A/S
Contract notice – utilities
Supplies
Directive 2014/25/EU
Section I: Contracting entity
39314878
Tonne Kjærsvej 65
Fredericia
7000
Denmark
Contact person: Anette Dahl
Telephone: +45 61244391
E-mail: adb@energinet.dk
NUTS code: DK
Internet address(es):
Main address: https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/228008
Section II: Object
Framework Agreement for Cable Monitoring Systems — DTS/DAS Systems
Design, supply and installation of distributed temperature sensing, point temperature measurement monitoring and optical fault location systems to optimize the digitalization of the Danish power transmission system.
Purchase of the design, supply and installation of distributed temperature sensing, point temperature measurement monitoring and optical fault location systems to optimize the digitalization of the Danish power transmission system.
2 times 1-year prolongation.
If more than [5] applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the [3-5] applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the submitted references. That is to which extend the reference(s) are assed to be similar to the tendered assignment, cf. section II.2.4), in terms of comparability and relevance. As a result, the number of references will not be the determining factor alone, but more importantly to which degree the specific forwarded references are comparable and relevant to the tendered assignment regarding solution and scope, especially concerning:
The references should include:
A specific description of the work performed for each reference (please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box), including:
— asset (cable) type monitored,
— integration of the solution with client’s maintenance network and Scada system,
— contract value (if possible),
— date of initiation and final delivery (day, month, year),
— contact information for the entity in question (including contact person). The Contracting Authority reserves the right to contact the stated references.
This is a negotiated procedure. With the exception of mandatory parts, the tender documents, and requirements set out herein, may be changed as part of the negotiation process. As a result, the Contracting Authority encourages all economic operators to submit questions concerning the tender documents and apply for prequalification even if a requirement may present a challenge initially.
Section III: Legal, economic, financial and technical information
The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report regarding the following economic indicators:
1) Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.);
2) Equity ratio (equity/total assets).
If the applicant is relying on the capacities of 1 or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3) “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
— equity must be at least 700 000 EUR,
— equity ratio must be at least 20 pct.
If the equity ratio is between 15 pct. and 20 pct., the supplier can qualify if equity exceeds 1 400 000 EUR.
The applicant must include the up to 5 most comparable and relevant references undertaken in the past three (3) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Undertaken in the past three (3) years implies that the reference must not have been completed prior to the date reached when counting 3 years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9).
The references should include:
A specific description of the work performed for each reference (please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box), including:
— asset (cable) type monitored,
— integration of the solution with client’s maintenance network and Scada system,
— contract value (if possible),
— date of initiation and final delivery (day, month, year),
— contact information for the entity in question (including contact person). The Contracting Authority reserves the right to contact the stated references.
If the applicant is relying on the references of 1 or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C) must also be given in a separate ESPD from each of these entities.
The number of references should not surpass a maximum of the 5 most comparable and relevant references. If the applicant is relying on the capacity of 1 or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the maximum number of references to be submitted must still be respected and cannot exceed 5 when combined. If the reference list(s) includes more than 5 references, the Contracting Authority will only consider the 5 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
The applicant must submit a completed version of the ESPD. Please see section VI.3) “Additional information” for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1) in this TED announcement. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The Contracting Authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
The information is stated in the tender material.
The information is stated in the tender material.
The information is stated in the tender material.
The information is stated in the tender material.
Section IV: Procedure
Section VI: Complementary information
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
To complete the ESPD, please:
— save the XML file onto your own computer (available from the Prequalification Material folder in EU-Supply),
— open the link https://ec.europa.eu/growth/tools-databases/espd/welcome
— choose the preferred language,
— choose “I am an economic operator”,
— choose “Import ESPD”,
— upload the XML file of the ESPD,
— choose the country of your companies origin,
— fill out and complete the ESPD with the information required in this contract notice,
— when finished filling out the ESPD selected “Overview” and check the information stated,
— after checking the information select “Download as” either pdf or/and XML file and it will be saved to the computer,
— upload the pdf and/or XML file version to “My response” in EU-Supply as your request for prequalification.
Please note the following:
An applicant participating on its own, but relying on the capacities of 1 or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: “Information concerning the economic operator” and part III: “Exclusion grounds” of the ESPD as well as the relevant information regarding part IV: “Selection criteria” and part V: “Reduction of the number of qualified candidates”. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Nævnenes Hus, Toldboden 2
Viborg
8800
Denmark
Telephone: +45 72405708
E-mail: klfu@naevneneshus.dk
Internet address: https://erhvervsstyrelsen.dk/klagenaevnet-for-udbud
Complaints regarding a candidate not being prequalified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1) 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2) 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3) 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
Carl Jacobsen Vej 35
Valby
2500
Denmark
Telephone: +45 41715000
E-mail: kfst@kfst.dk
Internet address: http://www.kfst.dk